Phase 2

The work has now been done to close the basement level with the ceiling and provide the floor for the upper level.

Cement joists have been fitted in between the steel framework and then the bricks that form the main part of the floor.

Concrete is then poured in and levelled to complete the process.

Start your dream today

Contact Us